Tulsa Downtowner Hotel Site Demolition

American Parking contracted with DT (Demolition Technologies) to remove the former Downtowner Hotel to create much needed parking for that area.

The aging 5 story Tulsa hotel was suffering from disrepair and the design of the structure did not lend it to be retrofitted.  The surrounding office buildings and buisness were in need of additional parking to increase buisness and occupancy.  The combination of these two elements demanded the need for the removal of this 42,000 square foot structure.

The structure shared a close proximity with other occupied office buildings and high volume downtown streets.  DT (Demolition Technologies) Specialized Services managed all aspects of the removal process from asbestos inspections to the utility seperatons.

The project was complete in under 14 days allowing the property owner to get back to buisness with minimal downtime.

Proper demolitoin project management is key.  Give DT (Demolition Technologies) a call so we can help you plan your next site clearance project in Tulsa.