Oklahoma Coal Reclaim Demolition

Location:  Muskogee Generation Station

Project Duration:  77 days

Scope of the project included the elimination of retired or non-functional components to the coal blending and supply system for the Muskogee Generation Station.  The task to remove the outdated systems and create more room for maintenance operations was contracted to DT.

The conveying and blending system was dismantled without disrupting the coal feed system to the power station.  DT removed all components of the coal blending system from the 50’ vertical concrete shaft.  Upon completion of equipment removal DT engineered and placed a concrete cap onto the top of the vertical shaft.

Project was contracted direct to OG&E