Griffin Communications KOTV Site Demolition 

The site clearance for the new KOTV studios in Tulsa required the retirement of 15,000 square feet of office buildings and over 20,00 square feet steel manufacturing building.  The removal required work along busy traffic corridor into Downtown Tulsa.

Engineered fill required to backfill a basement was needed to complete the site grading.  DT placed and compacted over 4,000 cubic yards of fill material.

DT recycled more than 400 ton of concrete, 20,000 masonry units, and 20 tons of steel from this project.  More than 77% of the waste from this project was directed out of the waste stream and placed back into new construction.

DT would like to help you recycle!