First Baptist Church Antenna Removal 

DT performed the surgical demolition of an obsolete micro wave tower, from the roof of a 6 story occupied structure, the Luther Building.  The steel frame was cut into sections and lowered onto truck below.  The project required precise pick plans and weight calculations.  Total height of the structure was 180 feet. 

The project was completed without incident and on schedule.